| Login Home | WebSite Map | Contract us | Chinese

   Minimize
Changsha electric power network system

      By using LD2000-RM MMS, Leador has accomplished the mapping for all the main roadways within 3 zones and collected over 10000 electric facilities within 10 working days through bad situation in city areas.

      High Accuracy Pipeline Installation Mapping

  

CopyRight © 2006 Leador CO.,LTD. All Right Reserved.   鄂ICP备 05012891 号
 WUHAN  LEADOR SPATIAL INFORMATION TECHNOLOGY DEVELOPMENT  CO., LTD.